Work the shop floor

Start and finish each step, count the good pieces and record scrap.

Manufacturing 5 steps Checked Nov 21, 2026

The shop floor shows each work center's queue: the steps waiting there, in order, and how full today is. The people doing the work start and finish their steps here, so the office can see where every build stands.

Before you start

Your recipes need steps at work centers. See Set up work centers and steps. Builds planned after that line up on the shop floor.

Do a step

  1. Open Make from the menu and choose Shop floor.
  2. Find the step under its work center. A step that says After the step before is not ready yet.
  3. Press Start. A clock starts for that step.
  4. Do the work.
  5. Press Finish. The clock has the time it ran. If the step was done without the clock, type the minutes it took.

Count and scrap

Press a step's name to open it. From there you can:

  • Read how to do it, and open any files attached to the step.
  • Under Record the count, type the good pieces and press Save count.
  • Open Record scrap, give the quantity and pick a reason, and press Save scrap.
  • Pause a running step, and pick it up again later.
  • Press Finish this step when it is done.

The good count from the last step becomes the build's good pieces when the build is finished.

On a phone

Steps given to you, and steps that are ready to start, show at the top of My day. Tap one to open it.

A sheet for the bench

Open a planned build and press Print traveler for a paper sheet that goes round the shop with the work.

Good to know

  • An admin sets the scrap reasons, under Settings, Business, Making.
  • Finishing every step does not finish the build. Somebody allowed to still does that, because it is what moves stock. See Finish a build.