Set up work centers and steps

Say where each step of a recipe is done and how long it takes.

Manufacturing 13 steps Checked Nov 21, 2026

A work center is a place where work is done: the roaster, the packing line, the paint booth. Steps say how a product is made, one work center at a time.

You do not need either to plan and finish builds. Set them up when you want the shop floor, the schedule, and labor in what a build costs.

Add your work centers

  1. Open Settings from the menu, open Business, and find Making.
  2. Press + Add a work center.
  3. Name it.
  4. Fill in Cost an hour: what an hour there costs you, pay and overheads together.
  5. Under When it works, tick the days and set the hours. Add a second span for a break in the day.
  6. Save it, and repeat for each one.

Give a recipe its steps

  1. Open Products from the menu and open the product.
  2. On the row for the size or kind you make, open Made from.
  3. Press + Add a step and name it, such as Roast.
  4. Choose its work center.
  5. Fill in the setup minutes (once for the whole build) and the minutes for each piece.
  6. Write how to do it, if it helps. Whoever works the step sees this.
  7. Add the rest of the steps in the order they happen, then save the product.

What steps change

  • A new build copies its product's steps. Builds already planned keep the steps they had.
  • A build with steps costs its labor from them, at each work center's cost an hour.
  • The steps line up on the shop floor and on the schedule.

Days nobody works

Under Days off in the same settings, press + Add days off for a holiday or a machine being serviced, for one work center or all of them. The schedule moves steps off those days.

Crew time without steps

If you do not want steps, you can still count labor. Tick Count crew time in what a build costs and say what a crew hour costs. Finishing a build then asks how many hours it took. Only an admin can change this.